COMMISSIONERS: Chairperson
Jim Tuttle; Tom Herlihy & Charles McGettigan.
CLERK: Diane
Nilsson
Jim
Tuttle called the meeting to order at
OTHER
BUSINESS:
Tom
Quinn wanted to discuss a letter from Emory & Garrett Groundwater dated
REGULAR BUSINESS
Wellhead Protection:
Of the two DES grants available, the Commissioners chose to go with the spill
mitigation, structure & materials grant.
C-Value Testing: Mr.
McGettigan will recheck all of the valves in the
downtown to see if they are fully open.
River Crossing:
According to CEI, invitations to bid have been given to five drilling
companies. This is for the “under the highway” phase.
Pennichuck Management Proposal: Commissioners discussed which
parts of the proposal they would like to pursue with Pennichuck.
It was agreed that as soon as Mr. Mcgettigan can get
the year-end water dept. budget from Carla they will meet and continue the
discussion.
Future Water Storage:
Mr. Tuttle reported that a bid was received from DuFresne
& Henry in
Minutes –
MOTION: Herlihy/McGettigan
to approve the
The
meeting adjourned at
Diane Nilsson, Clerk
ACTION ITEMS
§
Get year-end budget from
Carla.
§
Re-check all valves on
§
Arrange to get the
debris cleaned up at the dry hydrant area at Stockwell
Brook Dam.
§
Arrange for electrician
to encase telemetry wires, at water tank, in conduit.
§
Count the monitoring
wells on Route 31 S. and measure the sizes of the caps – for ordering locking
lids.
§
Install T and gate for
tank emergency connection.
§
Purchase the following
items from Granger: secondary containment pallets for 55 gallon barrels and a
20-gallon chemical spill kit.
§
Get current
copy of plumber’s insurance on file for Porter Plumbing.
Tom Herlihy
§
Contact Robert Merithew and ask for itemized proposal for Clerk of the
Works position relative to interior tank painting job.
§
Contact Dan Tinkham at EG&G re Tom Quinn’s concerns.
§
Contact CEI with SOW
from DuFresne & Henry.
§
Design invoice for
Backflow Preventer Testing program.
§
Put together list of
deadlines for annual, semi-annual, monthly etc. reports and tests.
§
Create Emergency Water
Supply Connection plan.
§
Test Emergency
Contingency Plan in 2006 per DES.
§
Install testable
backflow devices at the following locations: Fire Station, domestic &
sprinklers; two sewer pump stations; water pump station; hydrant for bulk water
users; two cemeteries; Recycling Center; LA Limo; Bursey’s;
Bakery; Ranamaki (if needed) & Intervale Rd photographer (if needed).
§
Find domestic and
sprinkler shutoffs at Draper Energy.
§
Come up with revised
rules & regulations after reviewing those of similarly sized towns. These
to include standardized costs for bringing new service to residences and
businesses as well as costs for meter installations, among other things.
§
Legal document –
§
Replace 3 left-handed
valves on
§
Paint inside of water
tank before 2006.
§
Retrofit pump at
§
Install 8” main on
§
Locate site for second
water tank.