COMMISSIONERS PRESENT: Chairman
MINUTES
OLD BUSINESS:
1. TANK PAINTING PROJECT –
Tank has been refilled with water to overflow on June 12-13. Samples drawn Mon., June 15. Bacteria tested by Chemserve
in
2. BACKFLOW DEVICES - LA
Limousine installation has not been completed yet. Wilton House of Pizza is still being
evaluated to determine correct way to install device. Board decided to contract NE Backflow Inc to
perform testing, repairs, installations starting Sept. 1st.
3. SYSTEM OPERATIONAL PROPOSAL - Decided
to hire A&D Instruments for electrical controls and trouble calls. We will contact 2 electricians for 3-phase
work at pump station.
4.
5. GENERATOR GRANT FUNDING APPLICATION - Emergency Generator Grant – we did
not receive any funding for this program which ends June 30. However, the Board decided to apply again to
Homeland Security Grant Program which is offered staring July 1st
with deadly e of Sept. 1st.
6.
PUMP
STATION EQUIPMENT PURCHASES
7. A&D Instruments submitted a proposal for new alarm panel
and alarms for heat, intrusion, chemical flows, pump failure, high and low tank levels, power and VDF power failures. The Board accepted the proposal as presented
and installation will start in about two weeks.
This system will be monitored by
8. Chemical Supplies – Harcross
Chemical submitted prices for supply of chemicals at pump station. The Board discussed the prices and wanted
more information on drum sizes.
OTHER
BUSINESS
9. Emery & Garrett submitted proposal to remove test wells
which are no longer useful within the well0head protection area. The Board reviewed the proposal and agreed to
proceed with the removal of the designated wells for $4,650. A Field Tech from Emery & Garrett will
supervise the work and have a drilling company fills the wells with Bentonite clay. Rymans Excavation will excavate the casings and cut off
approximately 2 ft below the ground before the clay is pumped in. The ground will be restored to original after
the sealing is complete.
10. Sand Hill reservoir – Gate City Fence submitted proposal to
repair the fence around the reservoir.
Trees had fallen damaging the fence mostly during the December 2008 ice
storm. The Board agreed to proceed with
the repairs for approximately $1,100.
They (
Move by
Charlie, second by Stan to adjourn the meeting at
Respectfully
submitted,
Transcribed
by